← All services
Pump Installation
The pump, riser pipe and controls that lift the water to the surface are fitted to suit the borehole, the depth and how the water will be used.

What is done
- 1
The pump sized to the borehole and the height the water has to be lifted.
- 2
Pump, riser pipe, cable and safety rope lowered and set at the right depth.
- 3
Borehole head and control box fitted and connected to the power supply.
- 4
A test run to confirm the flow before handover.
A pump oversized for the borehole is a common and costly mistake, so the pump is matched to the well.
