← All services
Hydrogeological Survey
A hydrogeological survey is necessary before a borehole is drilled. The ground on your plot is surveyed and the readings studied, so the drilling point is chosen on what the survey shows.

What is done
- 1
Your site visited so we can see the plot, the access and where the water will be used.
- 2
Field measurements taken across the plot and the readings studied.
- 3
A drilling point and an expected depth suggested from the survey.
- 4
The findings shared with you before any drilling is arranged.
A survey points to where to drill; it cannot promise a yield. If a plot looks poor we say so before a rig is brought to it.
Hydrogeological Survey on site










